Quote:
Originally Posted by R1_Demon
Took mine 7 weeks and 2 days from the day I mailed it into UT until the day I received my non-resident permit in the mail. I ended up turning in my NV (resident), FL (non-resident) and UT (non-resident) all on the same day and UT ended up taking the longest, even though it stated on it's site that it had the shortest expected turn around time of the three states. LOL
|
Keep in mind that they have about 6 people processing between 12,000 and 20,000 apps a month.