01-27-2017, 09:35 PM
|
Member
|
|
|
Join Date: Nov 2016
Location: Oregon
Posts: 106
Likes: 321
Liked 108 Times in 42 Posts
|
|
Quote:
Originally Posted by Sol-Invictus
I am on several notification lists. Was told by one dealer that average time from pictures on site to production was 8 months.
|
Makes me sad.
|