View Single Post
 
Old 03-10-2024, 04:43 AM
Shotguncoach Shotguncoach is offline
SWCA Member
 
Join Date: Jul 2017
Location: Arizona
Posts: 524
Likes: 412
Liked 2,523 Times in 416 Posts
Default

With the fire control components back in their homes and living happily together, it was time to go back to the cylinder and yoke assembly.

The yoke was checked for straightness and passed.

Yoke play was checked and some slop was found. There was .0025" of clearance between the yoke flange and the frame. A .002" yoke shim was stoned to remove any burrs and installed on the yoke. A bit of galling was observed which may be helped by the shim.
Attached Images
File Type: jpg IMG_0546.jpg (75.4 KB, 32 views)
File Type: jpg IMG_0544.jpg (110.9 KB, 31 views)
File Type: jpg IMG_0545.jpg (79.6 KB, 31 views)

Last edited by Shotguncoach; 03-10-2024 at 04:44 AM.
Reply With Quote
The Following User Likes This Post: