With the fire control components back in their homes and living happily together, it was time to go back to the cylinder and yoke assembly.
The yoke was checked for straightness and passed.
Yoke play was checked and some slop was found. There was .0025" of clearance between the yoke flange and the frame. A .002" yoke shim was stoned to remove any burrs and installed on the yoke. A bit of galling was observed which may be helped by the shim.
Last edited by Shotguncoach; 03-10-2024 at 04:44 AM.
|