- Joined
- Dec 16, 2014
- Messages
- 6,249
- Reaction score
- 17,297
- City & State/Province
- Along the Florida Ridge
Now that we’re in our new house surrounded by some land, I’m finally getting my own little workshop. I ordered it from Carolina Carports back in October and just got a call today that installation is scheduled for Feb. 4th., so it should actually be in place when I get back home from Vegas on Thursday.
I’m excited! mrs tlawler said the garage was hers back when we first started designing the house. In our old house, I had taken over the garage for my workshop/gun room and she frequently lamented the fact that she couldn’t park there.
It’s not huge by any means, compared to some outbuildings that you folks have shared your pictures of. It is 20’x24’ with a 12’ porch overhang, where I’ll set up a couple shooting lanes protected from the weather. I opted for a very strong building with 170 mph wind rating with impact doors, windows, and a 9’ high x 8’ wide roll up door, also with the 170 rating.
As soon as it’s installed, I’m going to have closed cell spray foam insulation put in that has about an R-6 value and will add considerably to the structural rigidity.
Here’s a picture of the slab just after it was poured back in October and a rendering of the building from the CC website.
I can’t wait!

I’m excited! mrs tlawler said the garage was hers back when we first started designing the house. In our old house, I had taken over the garage for my workshop/gun room and she frequently lamented the fact that she couldn’t park there.
It’s not huge by any means, compared to some outbuildings that you folks have shared your pictures of. It is 20’x24’ with a 12’ porch overhang, where I’ll set up a couple shooting lanes protected from the weather. I opted for a very strong building with 170 mph wind rating with impact doors, windows, and a 9’ high x 8’ wide roll up door, also with the 170 rating.
As soon as it’s installed, I’m going to have closed cell spray foam insulation put in that has about an R-6 value and will add considerably to the structural rigidity.
Here’s a picture of the slab just after it was poured back in October and a rendering of the building from the CC website.
I can’t wait!












